Operational Qualification (OQ) for Equipments
PROTOCOL
Requirements are as follows: |
a) Validation Team |
b) Objective |
c) Scope |
d) Responsibility |
e) Equipment description |
f) Operation Checks: i) Verify calibration of instrument associated with equipment ii) Verify PLC (Programmable Logic Control) validation of equipment iii) Control Panel Testing to perform to verify the response of equipment at input from various switches and push button iv) Power and Communication failure recovery: It is performed to verify the event of a power loss or communication failure, the equipment will stop in safe conditions v) Safety feature verification: It is performed to verify the safety parameters to avoid damage to equipments |
g) Verification of Standard Equipment/ Master Equipment used for qualification: i) List of enclosures ii) Training Certification iii) Change control procedure iv) Qualification Certification v) Summary & Conclusion vi) Document Revision History |
h) OQ report shall be complied by : Officer to Senior Executive Engineer Checked by: Senior Executive Reviewed by: Executive or Senior Manager QA and plant head Approved by: QA Head |
i) If conclusion of protocol is not satisfactory than rectify the problem and re-perform the OQ |
Copyright Notice: This Article/SOP/Compilation/Published Content is protected by Indian & International Copyright Laws. Reproduction and Distribution of the same without written permission is prohibited. Mail us at: info@pharmastate.com
For any suggestions & feedback, write to us at info@pharmastate.com
App Link: https://goo.gl/mS8Lr7
Website: https://www.pharmastate.com